Early design work

Turning local needs into a workable place.

These images help the community discuss what the hall could become. They are not approved or final plans.

Pre-planning material: all layouts, facilities, appearance, access arrangements and timescales remain subject to consultation, technical work, funding and planning permission.

Early artist's impression showing a low community hall building beside London Road
Early artist’s view from London Road. The eventual design may differ.

The emerging idea

Welcoming, practical and accessible.

The concept starts with a flexible main hall and smaller rooms that could operate together or independently. Accessibility is being considered from the outset, including accessible parking and a Changing Places toilet in the early layout.

The architectural material also explores timber structure, robust cladding and off-site construction methods. These remain design ideas rather than commitments.

Concept layout

Spaces under consideration.

Shared spaces

Main hall, welcome and waiting area, kitchen and secure outdoor space.

Smaller spaces

Two meeting rooms, an office and storage to support varied use.

Inclusive access

Accessible van parking, accessible facilities and a Changing Places toilet shown in the concept.

Open the concept plan PDF

The location

Beside London Road and Bollin Grange.

The proposed plot is on London Road at the edge of the newer housing development, close to existing homes and local businesses.

Access, highways, parking, landscaping and safe pedestrian routes will be considered through detailed design and the planning process.

Proposed community hall siteLondon Road, Lyme Green. Map data © OpenStreetMap contributors.

Indicative route

How the project could progress.

  1. Completed

    Establish the charity

    Lyme Green Community Hall CIO registered in March 2025.

  2. Current stage

    Planning and design

    Develop the brief, complete surveys, consult and prepare a planning application.

  3. Subject to permission and funding

    Detailed fundraising and build

    Confirm costs, secure capital funding, appoint a delivery team and construct the hall.

  4. Future

    Open and operate

    Establish bookings, staffing, volunteering and day-to-day management.

No completion date is presented as fixed at this stage.